JD Construction Inc.
New partition walls framed in a stripped basement
All projects
RenovationProgress photosWindsor–Essex, Ontario · 2025

Basement Renovation

A 1970s basement — wood panelling, sheet vinyl and a dated kitchenette — stripped to the block and re-framed for a modern lower level.

Before anything new goes in, everything old comes out: panelling, drop ceiling, flooring, the kitchenette and the original bathroom. Then the block walls are checked, strapped and framed so insulation and services run where they should.

Progress photos from demolition and framing. Finished photos will be added when the space is complete.

Year
2025
Location
Windsor–Essex, Ontario
Type
Lower-level renovation
Scope
Full demolition · new framing · bath & kitchenette
Status
Framing stage
Build something like this

Build timeline

Progress photos from the site, in order. Final interior photos will be added when the project wraps up.

5 stages
01Before — wood panelling and original sheet flooring
02The original basement bathroom
03The dated kitchenette before demolition
04Stripped back to the block walls with new framing started
05New partition walls framed, lumber staged for the next room

Start your project

Ready to build? Let’s talk about your plans.

A lot, a plan, a basement, or just an idea. We’ll walk it through with you honestly and give you a clear, written estimate.