A detached shop from the ground up — underground services trenched from the house, footings poured, and block foundation walls laid.
A detached shop starts underground. We trenched water and electrical from the house, excavated and poured footings, then laid the block foundation walls before the framing package arrived.
Progress photos from site services through foundation. The framed and finished building will be added as the build continues.
- Year
- 2025
- Location
- Windsor–Essex, Ontario
- Type
- Detached shop · new build
- Foundation
- Poured footings · concrete block walls
- Services
- Underground water & electrical from the house
- Status
- Foundation complete · framing next
Build timeline
Progress photos from the site, in order. Final interior photos will be added when the project wraps up.